West Covina

ADU Design, Permits and Construction in West Covina, California

We can show you a West Covina build rather than describe one. A 1,200 square foot detached ADU, documented stage by stage, with the city inspection dates printed.

Building an ADU in West Covina, in short

Poly Construction Holdings LLC is a licensed California General Building contractor (#1137539) working across the San Gabriel Valley from an office in Rosemead. In West Covina we built a 1,200 square foot detached ADU, 3 bed and 4 bath, permitted by the City of West Covina on 23 July 2026 and carried through to rough-in with every inspection recorded. Structural shell complete starts at $150 per square foot of floor area and takes 50 business days once permits are issued. Interior finishes are contracted separately by the owner.

Documented project
Detached ADU, 1,200 sq ft, 3 bed / 4 bath
Permit issued
23 July 2026, City of West Covina
Licence
California General Building #1137539
Shell price
From $150 per square foot of floor area
Shell timeline
50 business days, weekends and public holidays not counted
Languages
Mandarin, Cantonese and English

The inspections, with dates

Most contractors tell you they pass inspections. These are the ones this West Covina project actually passed, in order. They come from the job records, not from memory.

1 August 2026Footing
18 August 2026Under-floor plumbing
18 August 2026Gas piping test
26 August 2026Under-floor framing and insulation
27 August 2026First floor diaphragm
9 September 2026Framing and roof diaphragm
17 September 2026Rough electrical and mechanical
17 September 2026Exterior lath
17 September 2026Exterior weather barrier
The West Covina detached ADU seen from outside, exterior walls up and the roof on
The West Covina ADU with the shell closed in. The full stage-by-stage record is in the Site Journal.

What the structural shell price covers in West Covina

Structural shell complete, from $150 per square foot of floor area. Final cost depends on size and site conditions.
ItemIn the structural shellContracted separately by the owner
Time to structural shell complete50 business days, weekends and public holidays not countedFinishing runs after shell sign-off
FoundationIncludedNot applicable
Structural framingIncludedNot applicable
RoofIncludedNot applicable
Exterior wallsIncludedNot applicable
Windows and exterior doorsIncludedInterior doors and trim
Plumbing, electrical and HVACRough-in onlyFinish fixtures, lighting and appliances
Flooring, cabinets and countertopsNot includedOwner contracts separately
Interior paintNot includedOwner contracts separately

Design, construction drawings and West Covina permitting are handled by us as part of the project and are quoted separately from the per square foot shell price. You receive a written, itemised scope before signing anything.

West Covina ADU questions

Have you actually built in West Covina?

Yes, and the whole job is published. A 1,200 square foot detached ADU, 3 bed and 4 bath, permitted by the City of West Covina on 23 July 2026. Three Site Journal posts follow it from rebar through to rough-in, with photographs and the dates each inspection passed.

Who handles the West Covina permits?

We do. Construction drawings, submission, plan check corrections, the permit itself, and then the inspections through to sign-off. On the documented project the permit was issued on 23 July 2026.

What does an ADU cost in West Covina?

Structural shell complete starts at $150 per square foot of floor area. That covers the foundation, framing, roof, exterior walls, windows and exterior doors, and the plumbing, electrical and HVAC rough-in. Interior finishes are contracted separately by the owner. Final cost depends on size and site conditions, so we will not quote before seeing the property.

How long does it take?

50 business days to structural shell completion once permits are issued, with weekends and public holidays not counted. Design and city permitting come before that, and interior finishing after.

Can I build an ADU on my West Covina lot?

Usually yes, but what you can build depends on your particular parcel rather than a rule we can quote in advance. We look at the lot, check it against the current requirements, and tell you plainly what it will support. That evaluation is free.

Can we do all of this in Chinese?

Yes. Mandarin, Cantonese and English, from the first site visit through drawings, contract, permit questions and the final walkthrough.

Find out what your West Covina lot allows

Free evaluation, no obligation. Tell us the address and we will tell you what it can hold.

Request a free evaluation (626) 256-8888