Real job sites · Real progress

Site Journal

Progress updates from our active San Gabriel Valley projects, actual job-site photos and city inspection records, not renderings. If you want to know what a real ADU or new-home build looks like from foundation to finish, start here.

Latest update

Active project progress

Backyard ADU foundation pour in Rosemead, with tied rebar, formwork and the crew working the fresh concrete
Rosemead · New backyard ADU

ADU Foundation in Rosemead: Rebar to Finished Slab in One Day

The foundation is the one part of an ADU you cannot correct later. Pump truck placement, screeding, the float and trowel finish, and the stub-ups cast into the slab. With a 71 second site video.

Read the foundation story →
Garage conversion ADU site in Arcadia with exterior wall and roof work underway
Arcadia · 715 sq ft garage conversion ADU

Garage Conversion ADU in Arcadia: 715 sq ft, R30, Seismic Anchors

A garage turned into a 715 sq ft ADU: three-coat stucco over two weeks, 5/8 inch drywall, R30 roof insulation, and a seismic anchor bolt every 4 feet. With a bilingual video.

Read the garage conversion story →
West Covina ADU elevation with weather barrier and stucco lath installed and windows in place
West Covina · 1,200 sq ft detached ADU

West Covina ADU Rough-In: Water, Power and HVAC Before the Walls Close

The last look before drywall: drain stacks, copper supply stub-outs, HVAC refrigerant lines, steel protection plates and device boxes, with the city rough inspection record.

Read the rough-in story →
Wide view of the West Covina ADU foundation formwork and rebar layout
West Covina · 1,200 sq ft detached ADU

West Covina ADU Foundation Story: Rebar to Utility Rough-In

A look back at the earliest stage: rebar tying, formwork, underground utility trenching, and subfloor insulation with plumbing risers, with inspection records.

Read the foundation story →
Vaulted ceiling framing inside the West Covina ADU project
West Covina · 1,200 sq ft detached ADU

West Covina ADU Progress: Foundation to Weather Barrier

A 3-bed, 4-bath detached ADU with framing, rough electrical/plumbing, and exterior weather barrier complete per city inspection milestones, with job-site photos and inspection records.

Read the full update →

Curious what's possible on your own lot?

We'll evaluate your property for free and tell you honestly what's feasible, roughly what it costs, and how long it actually takes in your city.